AC Withstand Test

What is Required AC Withstand Test?

The AC Withstand Test (also known as AC Dielectric Test or High Voltage Test) is a non-destructive electrical test performed to verify the insulation strength of electrical equipment, components, or systems by applying a high alternating current (AC) voltage for a specified time.


🧪 Definition

The Required AC Withstand Test is the mandatory procedure that ensures an electrical device can withstand a high AC voltage without any breakdown, flashover, or insulation failure. It is essential in quality control, commissioning, type testing, and maintenance.


🔍 Purpose of the Test

  • Verify insulation integrity
  • Ensure safety of electrical equipment
  • Detect manufacturing defects
  • Prevent dielectric breakdown in service
  • Comply with international standards (e.g., IEC, IEEE, IS)

⚙️ Test Parameters

  • Voltage Applied: Usually 2× or 3× rated voltage
  • Frequency: 50 Hz or 60 Hz AC
  • Duration: Typically 1 minute
  • Leakage Current Monitoring: Checked for exceeding thresholds

📌 Where It Is Required

  • Power transformers
  • Cables and switchgear
  • Motors and generators
  • Circuit breakers and insulators
  • Electrical panels and busbars

🧯 Safety Precautions

  • Ensure proper grounding
  • Isolate the test object
  • Use calibrated test equipment
  • Maintain safe distance during testing

🧾 Standards Followed

  • IEC 60060
  • IEEE Std 4
  • IS 2071
  • IEC 60270 (for PD integration)

Who is Required AC Withstand Test?

AC Withstand Test

The AC Withstand Test is required by a wide range of individuals, organizations, and industries that manufacture, install, test, or maintain electrical equipment. Here’s a breakdown:


🏭 1. Electrical Equipment Manufacturers

They are mandated to perform AC withstand tests as part of:

  • Type testing (design validation)
  • Routine testing (production quality control)
  • Pre-delivery inspection

Examples:

  • Transformer manufacturers
  • Cable manufacturers
  • Switchgear producers
  • Motor and generator OEMs

🛠️ 2. Electrical Testing & Commissioning Companies

These companies perform the AC Withstand Test during:

  • Site acceptance testing (SAT)
  • Pre-commissioning checks
  • Periodic maintenance

They ensure the equipment is safe before energizing.


🧪 3. Third-Party Inspection & Certification Bodies

Organizations like:


🏢 4. Utilities and Power Generation Companies

To ensure grid equipment meets insulation strength standards and prevent outages:

  • Thermal, hydro, solar, and wind plants
  • Transmission & distribution utilities (like Power Grid, MSEB)

5. Industrial and Commercial Facilities

Large plants (e.g., chemical, automotive, steel) must conduct AC withstand tests on:

  • Internal switchgear panels
  • Power distribution systems
  • Emergency backup systems

🎓 6. Educational & Research Institutions

Engineering colleges, testing labs, and R&D centers use it for:

  • Teaching electrical insulation testing
  • Developing new insulation materials
  • Prototype validation

📜 Mandatory for Compliance With:

  • IEC, IEEE, NEMA, IS standards
  • Factory Acceptance Test (FAT)
  • Routine test reports for audits

When is Required AC Withstand Test?

Courtesy: vasavielectronics

The AC Withstand Test is required at specific stages of the electrical equipment’s lifecycle to ensure insulation integrity, safety, and compliance. Here’s when the test is typically performed:


🏭 1. During Manufacturing

  • Type Testing: On prototype units to verify design
  • Routine Testing: On every production unit to ensure consistency
    Why? To confirm insulation withstands expected operating voltages.

📦 2. Before Shipment (Factory Acceptance Test – FAT)

  • Ensures that equipment meets all specifications before delivery
    Why? To certify that equipment is safe and ready for installation.

🏗️ 3. At Installation Site (Site Acceptance Test – SAT)

  • After equipment installation, before energizing
    Why? To verify no damage occurred during transit or installation.

🔁 4. During Preventive Maintenance or Periodic Testing

  • Performed periodically based on criticality and regulations (e.g., every 2–5 years)
    Why? To assess insulation aging or degradation over time.

⚠️ 5. After Repairs or Modifications

  • When equipment undergoes rewinding, insulation replacement, or major repair
    Why? To revalidate insulation integrity before re-commissioning.

💥 6. Post-Fault Investigation

  • After electrical faults or flashovers
    Why? To check if the equipment can still safely operate.

📅 Standard Test Duration

  • Usually 60 seconds at a specified test voltage
  • May vary depending on voltage class, standard, and equipment type

📜 Regulations That Define When to Test

  • IEC 60060
  • IEEE Std 4
  • IS 2071
  • OEM-specific testing protocols

Where is Required AC Withstand Test?

The AC Withstand Test is required anywhere electrical insulation quality must be verified—from manufacturing floors to high-voltage substations. Here’s a breakdown of locations and environments where it is typically performed:


🏭 1. At Manufacturing Facilities

  • Transformer plants
  • Cable production units
  • Motor/generator assembly lines
  • Switchgear and panel board manufacturers

✅ Used for type and routine testing before products leave the factory.


🏗️ 2. At Installation or Project Sites

  • Power plants (thermal, hydro, solar, wind)
  • Industrial complexes (steel, cement, pharma, oil & gas)
  • Commercial buildings (malls, data centers, hospitals)
  • Residential high-rise electrical panels

✅ Conducted as Site Acceptance Tests (SAT) to ensure no insulation damage during transport or installation.


3. At Power Utilities and Substations

  • Transmission substations (400 kV, 220 kV, 132 kV)
  • Distribution substations (33 kV, 11 kV, LT systems)

✅ Ensures switchgear, cables, bus ducts, CTs/PTs meet safety and reliability standards.


🧪 4. In Accredited Testing Laboratories

  • NABL, ISO 17025 certified labs
  • Central Power Research Institute (CPRI)
  • Electrical Research and Development Association (ERDA)
  • Private labs like TUV, SGS, Intertek

✅ Used for third-party certification, prototype testing, and customer-specified verifications.


🛠️ 5. At Repair Workshops

  • Generator/motor rewinding shops
  • Transformer refurbishing units

✅ AC withstand tests are done post-repair to ensure insulation is restored to safe levels.


🚧 6. In Field Testing Units / Mobile Testing Vans

  • For onsite high-voltage testing of installed equipment in remote or large plants

✅ Helps test without dismounting equipment from service.


🌐 Geographical Regions (Regulatory Demand)

  • India: Mandated by IS/IEC standards (e.g., IS 2071, IS 2026)
  • USA/Canada: NEC, ANSI/IEEE, UL standards
  • Europe: EN/IEC norms
  • Middle East & Asia-Pacific: Often follow IEC/ISO norms via utilities or consultants

How is Required AC Withstand Test?

AC Withstand Test 2

The Required AC Withstand Test is carried out by applying a high-voltage AC signal to an electrical device to check whether its insulation system can endure the stress without breakdown. The process is precise and must follow safety and standard protocols.


🔄 Step-by-Step Procedure:

✅ 1. Preparation

  • Isolate the equipment from the power supply.
  • Clean and dry the test object to prevent surface leakage.
  • Ground all other equipment or terminals not under test.
  • Ensure safety barriers and signage are in place.

✅ 2. Test Equipment Setup

  • Use a High Voltage Test Set (0–100 kV AC or higher, depending on equipment rating).
  • Connect:
    • HV lead to the test object
    • Return/ground lead to earth
  • Install a voltmeter and ammeter to measure leakage and applied voltage.

✅ 3. Apply Test Voltage

  • Gradually increase the AC voltage from 0 to the specified level (e.g., 2× or 3× the rated voltage).
  • Hold the full test voltage for 1 minute (typical).
  • Monitor:
    • Leakage current
    • Visual/audible signs of insulation failure
    • Partial discharge (if applicable)

✅ 4. Observe Results

  • Pass: No breakdown, no abnormal leakage, no flashover.
  • Fail: Flashover, insulation breakdown, arcing, excessive leakage.

✅ 5. Reduce Voltage & Disconnect

  • Slowly bring voltage back to zero before disconnecting.
  • Record all parameters and test conditions.

🧪 Typical Test Voltage Values

Equipment TypeTest Voltage (rms)Duration
LV Cables (1.1 kV)3 kV1 min
MV Switchgear (11 kV)28 kV1 min
Transformers (33 kV)70 kV1 min

(Actual values depend on standards like IEC/IEEE/IS)


🛡️ Safety Measures

  • Use interlock systems and warning alarms
  • Maintain safe distance from HV parts
  • Only trained personnel should operate
  • Always discharge the test object after testing

📜 Standards Followed:

  • IEC 60060-1 – High-voltage test techniques
  • IEEE Std 4 – High-voltage testing techniques
  • IS 2071 – Indian standard for HV tests
  • IEC 60270 – If partial discharge is monitored

Case Study on AC Withstand Test?

🏷️ Title:

Ensuring Insulation Integrity of 33 kV Outdoor Vacuum Circuit Breakers Using AC Withstand Test at a Power Distribution Substation


🏢 Client:

State Electricity Board (SEB) – Power Distribution Substation, Maharashtra, India

🎯 Objective:

To validate the dielectric strength and ensure safe commissioning of newly installed 33 kV outdoor Vacuum Circuit Breakers (VCBs) by performing the Required AC Withstand Test as per IS 3427 and IEC 62271-100 standards.


🧰 Equipment Tested:

  • 3-phase 33 kV Outdoor VCBs
  • Rated Voltage: 33 kV
  • Rated Insulation Level: 70 kV (rms) AC for 1 min

⚙️ Testing Parameters:

ParameterValue
Applied Voltage (rms)70 kV
Frequency50 Hz
Test Duration60 seconds
Test Equipment Used100 kV AC High Voltage Test Set
EnvironmentOutdoor, clear weather, <60% RH

🔄 Procedure:

  1. Isolation of the VCBs from live grid.
  2. All earthing verified and safety barriers installed.
  3. Test leads connected: one to the terminal and one to ground.
  4. Voltage ramped up to 70 kV at ~2 kV/sec.
  5. Voltage held for 1 minute while leakage current was monitored.
  6. After test, voltage was gradually reduced and equipment safely grounded.

📊 Results:

VCB IDLeakage CurrentFlashover ObservedVerdict
VCB-112 µANoPass
VCB-210 µANoPass
VCB-311 µANoPass

All three units passed without any breakdown or flashover.


🧠 Findings:

  • The insulation was in excellent condition.
  • Ambient conditions were favorable.
  • Proper pre-conditioning helped avoid moisture-related failures.

Conclusion:

The Required AC Withstand Test successfully verified insulation integrity of the 33 kV VCBs. The VCBs were safely energized and commissioned into the substation network. The test ensured compliance with national and international dielectric performance standards.


📎 Lessons Learned:

  • Pre-conditioning in humid zones is crucial.
  • Proper test lead connection avoids localized flashovers.
  • AC withstand tests can prevent catastrophic failures during energization.

White paper on AC Withstand Test?

Courtesy: LED TESTER – LISUN

Ensuring Insulation Reliability in High Voltage Equipment


🏷️ Title:

The Role of Required AC Withstand Testing in Electrical Insulation Assurance and Grid Reliability

🏢 Author:

Six Sigma Labs – Electrical Testing & Quality Assurance Division

🗓️ Date:

June 2025


📘 Executive Summary

The Required AC Withstand Test (also known as AC High Voltage Test or Dielectric Test) is a critical procedure in ensuring safe operation of electrical equipment. It validates the insulation strength of systems such as transformers, switchgear, cables, and motors by applying a controlled high-voltage AC signal. This white paper explores the methodology, standards, applications, and risk management aspects of AC Withstand Testing across industries.


🔬 1. Introduction

Insulation failure is one of the leading causes of electrical system breakdown. The AC Withstand Test offers a non-destructive yet stressful evaluation of insulation materials. It is mandated by standards such as IEC 60060, IS 2071, and IEEE Std 4, and forms part of type testing, routine testing, and maintenance protocols.


⚙️ 2. Principle of the AC Withstand Test

The test applies an AC voltage (typically 2 to 3 times the rated voltage) for a defined period (usually 1 minute). The insulation must withstand this voltage without breakdown, discharge, or flashover.

Key Parameters:

  • Voltage range: Up to 200 kV or more
  • Frequency: 50 or 60 Hz
  • Duration: 60 seconds
  • Outcome: Pass/Fail based on insulation performance

🛠️ 3. Test Methodology

3.1 Setup:

  • Disconnect object under test
  • Connect high-voltage and return leads
  • Install leakage current measurement system
  • Ground all non-tested components

3.2 Execution:

  • Ramp up voltage slowly
  • Maintain test level for specified duration
  • Observe for dielectric failure (visual, audible, current spikes)
  • Gradually ramp down voltage

3.3 Safety:

  • Use interlocks and warning signage
  • Ensure test area isolation
  • Equip personnel with insulating PPE

📋 4. Industry Applications

IndustryEquipment TestedPurpose
Power GenerationTransformers, CTs, PTsFactory & site testing
Transmission & DistributionSwitchgear, InsulatorsGrid reliability
Oil & GasMotors, VFDsExplosion risk reduction
ManufacturingCables, Panel BoardsCompliance & QA
RenewablesSolar Inverters, Wind TurbinesField validation

📊 5. Standards & Compliance

  • IEC 60060-1 – High voltage test techniques
  • IS 2071 – General definitions and test requirements
  • IEEE Std 4 – Standard techniques for HV testing
  • IEC 62271 – For switchgear testing
  • IS 2026 – For transformer dielectric testing

📈 6. Benefits

  • Early detection of weak insulation
  • Prevents catastrophic failures
  • Ensures regulatory and customer compliance
  • Extends equipment lifespan
  • Essential for FAT, SAT, and periodic audits

⚠️ 7. Challenges and Mitigation

ChallengeMitigation Strategy
Moisture absorptionPre-drying or pre-heating
Field test logisticsUse of mobile HV vans
Operator errorSOP training & automation
Surface trackingClean & dry surfaces

📍 8. Future Outlook

With the increasing integration of renewables, smart grids, and HVDC systems, dielectric performance expectations are rising. Condition-based testing, AI-integrated HV test kits, and partial discharge coupling with AC withstand testing are shaping the future of insulation assessment.


🧾 9. Conclusion

The Required AC Withstand Test is indispensable for modern electrical infrastructure. When properly implemented, it becomes a frontline tool in ensuring equipment safety, reducing downtime, and upholding compliance with global standards.


📚 10. References

  • IEC 60060-1: High-voltage test techniques
  • IS 2071: Methods for HV testing
  • IEEE Std 4: Techniques for High Voltage Testing
  • CIGRÉ & NETA guidelines on insulation assessment
  • Manufacturer specifications (ABB, Siemens, Schneider)

📎 Appendices

  • Appendix A: Sample Test Report Format
  • Appendix B: Pass/Fail Criteria by Voltage Class
  • Appendix C: Safety Checklist

Industrial Application of AC Withstand Test?

The AC Withstand Test is widely used across various industries and sectors to ensure the safety, reliability, and regulatory compliance of electrical equipment. It plays a crucial role in high-voltage insulation testing, preventing failures that could lead to power outages, equipment damage, or safety hazards.


1. Power Generation & Distribution

Applications:

  • Transformers (power and distribution)
  • Switchgear (LV, MV, HV)
  • Circuit breakers and isolators
  • Instrument transformers (CTs & PTs)
  • Busbars and insulators

Purpose:

  • Verify dielectric strength
  • Confirm equipment integrity before energization
  • Meet IS/IEC/IEEE standards

🏗️ 2. Industrial Manufacturing Plants

Applications:

  • Motor control centers (MCCs)
  • Panel boards
  • Electric drives and motors
  • Heating elements and reactors

Purpose:

  • Factory acceptance testing
  • Ensure safe start-up of equipment
  • Detect insulation damage in harsh industrial environments

🛢️ 3. Oil & Gas Industry

Applications:

  • Explosion-proof motors and pumps
  • Control panels in hazardous areas
  • HV cables in offshore rigs and refineries

Purpose:

  • Prevent electrical sparks
  • Comply with ATEX and IECEx safety requirements
  • Improve system uptime in critical processes

🏢 4. Commercial & Infrastructure Projects

Applications:

  • High-rise building electrical panels
  • Backup power systems (DG sets, UPS)
  • Elevators, HVAC systems

Purpose:

  • Ensure safety of human occupants
  • Fulfill local building electrical safety codes
  • Periodic electrical audits

🌞 5. Renewable Energy Sector

Applications:

  • Solar inverters and transformers
  • Wind turbine generators
  • Battery energy storage systems (BESS)

Purpose:

  • Test HV insulation for grid-tied connections
  • Minimize failure in extreme weather conditions
  • Enhance life expectancy of eco-friendly systems

🚅 6. Railways & Transportation

Applications:

  • Traction transformers
  • Onboard and trackside electrical systems
  • Signaling equipment

Purpose:

  • Safety-critical insulation testing
  • Prevent power disruption on rail networks

🧪 7. Testing Laboratories & R&D Centers

Applications:

  • Material development and dielectric testing
  • Prototype validation
  • Type testing for certification

Purpose:

  • Research insulation life cycles
  • Benchmarking and product development
  • Compliance for product release

🧰 8. Maintenance Service Providers

Applications:

  • Preventive and predictive maintenance
  • Periodic high-voltage insulation testing
  • Troubleshooting post-fault failures

Purpose:

  • Avoid unplanned downtime
  • Identify aging insulation
  • Extend equipment service life

📈 Summary Table

Industry SectorKey Equipment TestedMain Objective
Power UtilitiesTransformers, switchgearGrid reliability and insulation assurance
ManufacturingMotors, panels, MCCsSafe operation and quality compliance
Oil & GasExplosion-proof motors, VFDsSafety in hazardous zones
RenewablesSolar/wind electrical systemsGrid connection reliability
RailwaysTraction & signaling equipmentOperational safety and uptime
Commercial BuildingsElectrical infrastructureBuilding safety and certification
Testing LabsPrototypes and new materialsProduct development and benchmarking
Service ProvidersAll electrical equipmentMaintenance and troubleshooting

References

  1. ^ MIL-STD-202G, Method 301, Dielectric Withstanding Voltage
  2. Jump up to:a b Paul Gill (2009), Electrical Power Equipment Maintenance and Testing, Second Edition, CRC Press, 1574446568, page 459
  3. ^ Condor Application Note 5/00, pg. 2
  4.  “A guide to insulation resistance testing” (PDF). Biddle Megger. Archived from the original (PDF) on 2009-02-06.
  5. Jump up to:a b “Electrical Safety Tests”EBME.co.uk. Retrieved 18 February 2016.
  6. ^ Wilson, Richard (15 November 2013). “Know your MOPPS from your MOOPS in medical power supply design”Electronics Weekly. Retrieved 18 February 2016.
  7. ^ Wilson, Richard (15 November 2013). “Know your MOPPS from your MOOPS in medical power supply design”Electronics Weekly. Retrieved 18 February 2016.
  8. ^ “AAMI Standards and Recommended Practices” (PDF). aami.org. American National Standards Institute, Inc. Archived from the original (PDF) on 2015-09-21.
  9. ^ “CAN/CSA-C22.2 NO. 60601-1:08 (R2013)”scc.ca. Standards Council of Canada. 11 September 2023.
  10. ^ Bayliss, Ann-Marie. “Understanding the 3rd edition medical safety standard and using DC-DC converters to provide isolation” (PDF). go.murata.com. Murata.
  11. Jump up to:a b c “Medical Approvals for Power Supplies” (PDF). epsma.org. EPSMA.[dead link]
  12. ^ “MOPP and MOOP in IEC 60601-1 3rd” (PDF). Mouser.com.
  13.  Srinivas, N.N; Duffy, E.K.; Starrett, W. (January 1993). “Effect of dc testing on extruded cross-linked polyethylene insulated cables”. EPRI. OSTI 6688245{{cite journal}}: Cite journal requires |journal= (help)
  14. ^ Hampton, N.; Hernandez-Mejia, J.C.; Kuntsevich, M.; Perkel, J.; Tomer, V. “Estimating the Impact of VLF Frequency on Effectiveness of VLF Withstand Diagnostics”. NEETRAC, Atlanta, USA.
  15. ^ Hampton, R.N; Hernandez, J.C.; Perkel, J.; Begovic, M.; Hans, J.; Riley, R.; Tyschenko, P.; Doherty, F.; Myrray, G.; Hong, L.; Pearman, M.G.; Fletcher, C.L.; Linte, G.C. “Experience of withstand testing of cable systems in the USA” (PDF). CIGRE 2010.
  16. ^ Eager, G.S.; Katz, C.; Fryszczyn, B.; Densley, J.; Bernstein, B.S. (Apr 1997). “High voltage VLF testing of power cables”. IEEE Transactions on Power Delivery12 (2): 565–570. doi:10.1109/61.584323.
  17. ^ “IEEE 400.2:2013, Guide for Field Testing of Shielded Power Cable Systems Using Very Low Frequency (VLF)”. IEEE-SA.
  18.  Srinivas, N.N; Duffy, E.K.; Starrett, W. (January 1993). “Effect of dc testing on extruded cross-linked polyethylene insulated cables”. EPRI. OSTI 6688245{{cite journal}}: Cite journal requires |journal= (help)
  19. ^ Hampton, N.; Hernandez-Mejia, J.C.; Kuntsevich, M.; Perkel, J.; Tomer, V. “Estimating the Impact of VLF Frequency on Effectiveness of VLF Withstand Diagnostics”. NEETRAC, Atlanta, USA.
  20. ^ Hampton, R.N; Hernandez, J.C.; Perkel, J.; Begovic, M.; Hans, J.; Riley, R.; Tyschenko, P.; Doherty, F.; Myrray, G.; Hong, L.; Pearman, M.G.; Fletcher, C.L.; Linte, G.C. “Experience of withstand testing of cable systems in the USA” (PDF). CIGRE 2010.
  21. ^ Eager, G.S.; Katz, C.; Fryszczyn, B.; Densley, J.; Bernstein, B.S. (Apr 1997). “High voltage VLF testing of power cables”. IEEE Transactions on Power Delivery12 (2): 565–570. doi:10.1109/61.584323.
  22. ^ “IEEE 400.2:2013, Guide for Field Testing of Shielded Power Cable Systems Using Very Low Frequency (VLF)”. IEEE-SA.
  23.  “Understanding Insulation Resistance Testing”Electrical Construction & Maintenance (EC&M) Magazine. 1996-01-01. Retrieved 2019-08-14.
  24. ^ “Electrical Isolation | Transformers | Electronics Textbook”www.allaboutcircuits.com. Retrieved 2019-08-14.
  25. ^ Electrical Isolation Verification (DC) Practice No. PT-TE1417, Preferred Reliability Practices, NASA

Table of Contents

Leave a Comment

Your email address will not be published. Required fields are marked *

Follow Us

swachh_bharat
made_in_india
beti_bachao
75th independence day
swachh_bharat
made_in_india
beti_bachao
75th independence day

2025. Copyright sixsigma-tqm.in