Mukesh Singh

Ethical Audits

For a Six Sigma-focused organization, every process—including supplier audits—is an opportunity to eliminate defects, reduce risk, and drive excellence. An Ethical Audit is not just a “check-the-box” exercise; it is a critical process for mitigating risks that can directly impact brand reputation, operational continuity, and financial performance (the Cost of Poor Quality – COPQ).

Ethical Audits Read More »

Production Monitoring

Production Monitoring (PM) is the continuous process of tracking, collecting, and analyzing data from manufacturing equipment and processes in real-time (or near-real-time). Its primary goal is to provide a clear, immediate view of production floor performance to ensure it is running efficiently, meeting quality standards, and staying on schedule.

Production Monitoring Read More »

Container Loading Check

A Container Loading Check (CLC) is a systematic inspection and verification process conducted before and during the loading of cargo into a shipping container. Its primary purpose is to ensure the cargo is loaded safely, securely, and efficiently for transport, minimizing the risk of damage, loss, and compliance issues.

Container Loading Check Read More »

During Production Check (DUPRO) and Inline Inspection (ILI)

This is an excellent question that gets to the heart of quality control in manufacturing, especially in industries like apparel, footwear, and consumer goods.

Here’s a clear breakdown of DUPRO (During Production Check) and Inline Inspection (ILI), including their differences, purposes, and when to use them.

During Production Check (DUPRO) and Inline Inspection (ILI) Read More »

Initial Production Check

An Initial Production Check (IPC) is a quality control inspection conducted at the very beginning of the mass production process. Its primary purpose is to verify that production has started correctly and that the factory can produce goods that meet the required specifications, quality standards, and legal regulations before a significant portion of the order is completed.

Initial Production Check Read More »

Pre-Customs Clearance for Mexico

The term you’re asking about, Pre-Customs Clearance for Mexico, is commonly known as Pre-Clearance or Pre-Despacho Aduanal. It is a formal, electronic process that allows importers to submit and process their customs declaration before the cargo physically arrives at the Mexican border.

Pre-Customs Clearance for Mexico Read More »

Pre-Shipment Inspection

A Pre-Shipment Inspection (PSI) is a quality control procedure conducted on finished goods after they have been manufactured but before they are shipped to the buyer. Its primary purpose is to verify that the products meet the specifications, quality standards, and requirements agreed upon in the purchase order.

Pre-Shipment Inspection Read More »

ISO 42001 Facility Management System

The ISO 42001 Facility Management System (FMS) is an international standard that provides a structured framework for managing facilities efficiently, sustainably, and strategically. Facilities today are not just physical assets but critical enablers of organizational performance, safety, and sustainability. ISO 42001 ensures that organizations align their facility operations with business goals while meeting legal, regulatory, and stakeholder requirements.

ISO 42001 Facility Management System Read More »

ISO 21001 Educational Organization Management Systems

ISO 21001 is an international standard specifically designed for educational organizations to help them enhance the quality of their educational processes and improve learner satisfaction. Unlike general management standards, ISO 21001 addresses the unique needs of schools, universities, training centers, and other institutions that deliver education, both formal and informal.

ISO 21001 Educational Organization Management Systems Read More »

Follow Us

swachh_bharat
made_in_india
beti_bachao
75th independence day
swachh_bharat
made_in_india
beti_bachao
75th independence day

2025. Copyright sixsigma-tqm.in